Palmetto Electric Rate Schedule |
||||
SCHEDULE 1 – |
Facility Charge |
$0.90 per meter, per day |
||
|
|
|
||
SCHEDULE II – |
Facility Charge |
$0.90 per meter, per day |
||
|
|
|
||
Power Cost Adjustment |
The above rates may be increased or decreased by .0001⊄ per kWh for each .0001⊄ by which the Cooperative’s average purchase power cost per kWh sold exceeds or is less than 8.40⊄ per kWh. |
|||
|
|
|
||
SCHEDULE LPS1 and LPS2 |
(Rates available upon request) |
|||
SCHEDULE OL |
(Rates available upon request) |
|||
SCHEDULE GST1 |
(Rates available upon request) |
|||
SCHEDULE NMP – TOU |
||||
SCHEDULE RT1 |
||||
(South Carolina Sales Tax and local franchise fees to be added where applicable.) |